Project Description

Sprial Welded Steel Pipe – Glorysteelwork specialized in offering Sprial Welded Steel Pipe for Oil and Gas industry 0Cr13、1Cr17、00Cr19Ni11、1Cr18Ni9、0Cr18Ni11Nb、16Mn、L245、L290、X42、X46、X70、X80.

WT torlerance:+/-0.25mm

Standard: ASTM A53,BS1387-1985,GB/T3091-2001,GB/T13793-92, GB/T6728-2002

place of origin:Tianjin

Production capability:10000ton/month

MOQ:1 twenty feet container

packing:  in bundles or as customers’ request

delivery time: 3-4 weeks after receving your deposit

Sprial Welded Steel Pipe application:

Used For Gas, Petroleum

Product Name

Spiral Welded Pipe/Sprial Tube/Spiral Steel Tube

Size

OD:

219-2220mm

Thickness:

4-18mm

Length:

6m/9m/12m Or Other Size According To The Contract

Steel Material

Q195, Q215, Q235, Q345 (Chinese Grade. Other Material Can Be Ordered)

Standard

GB/SY/DIN/ASTM/ASME/ASNI/API/

Usage

Used For Gas, Petroleum, Water ,Oil, Structure And Sewage

Ends

Plain or Beveled (Can be Protected By Plastic Pipe Cap)

Surface

Bared Or Paint With Oil, Bitumen,1-3 layer PE

(Outside Or Inside Anti-Corrosion Treatment Can Supply)

Inspection

With Hydraulic Testing, Eddy Current , Infrared or X-Ray Test

Also With Chemical And Physical Property Inspect

Technique

Hot Rolled and SAW/ERW/SSAW

Type

Welded

Welded Line Type

Spiral

Section Shape

Round

Package

In Bulk, Or Other Method According To The Contract

Date of Delivery

Less Than 15/20/25/30/40/50/60 Days According To The Quantity

Port of Shipment

Xingang,China

Others:

We also supply pipe fittings for example screws and flange

Our products are high quality but low price.

Wish you contact us.